Entries by CCM Admin

Continental Construction Management Rehabilitated Adam’s Senior Apartments

The Adam’s Senior Apartment complex is located in Westland, MI, which was originally built in 1999. There was a variety of 1-, 2- and 3-bedroom ranch-style homes, each with their own entryway and individual patios. Adam’s is an independent living, affordable housing community, for seniors aged 62 and older. We rehabilitated 120 garden-style apartment units, […]

Continental Construction Management Constructed Clubhouse at Trilogy Apartments

We constructed a new 8,000+ square foot clubhouse with management office atThe Trilogy Apartments in Belleville, MI. We also demolished the existing tennis courts to install a new pool. We also eliminated 3 existing pools throughout the complex. Inside the clubhouse, we constructed an expansive and stylish resident lounge with multiple seating areas, a conference […]

Continental Construction Management Restored Gabrielle Apartments

The Gabrielle Apartments is a 10-story high-rise building with 1-, 2-, and 3-bedroom units that were originally built in 1979. We restored 336 units after fire and smoke damage. We did major cleaning of both the exterior of the building (soot accumulation on the exterior window ledges) and the interior of the units (hand wiping […]

Continental Construction Management Emphasizes ‘Green’ Building Practices

Continental Construction Management is committed to providing and ensuring residents with a safe quality place to call home. The team at Continental Construction makes certain that all materials and products will enhance the wellbeing of residents as well as the environment. They emphasize the practice of using healthier and more resource-efficient “green” materials and products. […]

Continental Construction Management Restored Oak Meadows Apartments

The Oak Meadows complex has a mix of apartments, townhomes, garden-style apartments, and houses. There are 1-, 2-, 3-, and 4-bedroom units available. It was originally built in 1972. We did a complete gut restoration of 6 units because of fire and water damage. First, we replaced all the studs and roof joists, then we […]

Continental Construction Management Rehabilitated Mill Pond Manor Apartments

The Mill Pond Manor Apartments is a 2-story with 58 1-bedroom units, that were originally built in 1980. It is an affordable housing community, with all units being Section 8 assisted living units. We rehabilitated 58 units, which included new cabinetry, lighting, flooring, and appliances installed into the resident’s units. Other improvements included upgrades to […]

Continental Construction Management Restored Gabrielle Apartments

The Gabrielle Apartments is a 10-story high-rise building with 1, 2, and 3-bedroom units that was originally built in 1979. We restored 8 units after flood damage (on multiple floors). In each unit, we installed all new drywall, new flooring, carpet, kitchen cabinets and flooring, and new bathroom fixtures, tub surround. All the walls were […]

Continental Construction Management Renovated Buena Vista Glendale Apartments

The community of Buena Vista Glendale consists of two property styles. A 7-story mid-rise building that offers 1- and 2-bedroom apartment homes for ages 55 and better and/or disabled seniors. They also have one- and two-bedroom “garden style” apartments for families who do not fit the senior criteria. We renovated of 93 units—73 units in […]

Continental Construction Management Restored Vista Villa Apartments

Vista Village Apartments offer a choice of one and two bedroom apartments and two and three bedroom townhomes. It was originally built in 2002. We restored 6 units because of fire and water damage. First, we did a complete gut restoration of one unit, which had the fire. We installed a brand new kitchen with […]

Continental Construction Management Restored Genesis Villas

The community of Genesis Villas is located in the midtown district of Detroit, MI. The 2- and 3-bedroom apartments and townhomes feature all major appliances (including washer and dryer), garbage disposals, central air conditioning, wall-to-wall carpeting, and attached garages. We restored 89 units and the garages after flood damage. We did repairs to drywall, flooring, […]